The latest project at Izzy's is the installation of a KC Raceware third link and ISC Racing panhard bar onto MiDiv IT7 racer Mark Jeffery's first generation RX7.
Page construction in progress...
The suspension we are installing will be swapped over to a new chassis over the winter, so we are making copies of any permenant brackets as well as converting some parts to bolt in units rather than weld in.
The fuel cell relocation was fairly straightforward. The cell was moved rearward about 4 inches from it's original location so no floorpan modifications were necessary. Some trimming was required on the rear frame crossbar that ties to the original spare tire well. The cell was also lowered 4 inches. A frame was made out of 3/4" tubing to support and protect the cell.