Izzy's Custom Cages - RX7 Tri Link and Fuel Cell Installation
  • KC Raceware Tri-Link
  • ISC Panhard Bar
  • Fuel Safe Cell Reinstall

    This project consisted of the installation of a KC Raceware third link or Tri-Link, and ISC Racing panhard bar onto MiDiv IT7 racer Mark Jeffery's first generation RX7. After the tri-link & panhard bar installation, the fuel cell relocation was fairly straightforward. The cell was moved rearward about 4 inches from it's original location so no floorpan modifications were necessary. Some trimming was required on the rear frame crossbar that ties to the original spare tire well. The cell was also lowered 4 inches. A frame was made out of 3/4" tubing to support and protect the cell.

    Izzys Custom Cages

    Need a custom cage built for your SCCA, NASA or BMWCCA Club Racer, Open Track Racer, Drag Car, or Street Car?

    Contact Us Here
    Copyright 2003-2009
    Izzy's Custom Cages, L.L.C.
    Terms & Conditions
  • FB RX7 KC Raceware Tri-Link and ISC Panhard Bar Installation border=0 width= FB RX7 KC Raceware Tri-Link and ISC Panhard Bar Installation border=0 width= FB RX7 KC Raceware Tri-Link and ISC Panhard Bar Installation border=0 width=
    FB RX7 KC Raceware Tri-Link and ISC Panhard Bar Installation border=0 width= FB RX7 KC Raceware Tri-Link and ISC Panhard Bar Installation border=0 width= FB RX7 KC Raceware Tri-Link and ISC Panhard Bar Installation border=0 width=
    FB FB FB RX7 ISC Panhard Bar Installation border=0 width=
    The suspension we installed was to be swapped over to a new chassis over the winter, so we made copies of any permenant brackets as well as converted some parts to bolt in units rather than weld in.